|
|
|
|
The Installation Process
First we work with you to layout and mark the desired location of your edging.
Then we use a bed edger to create a trench from 1 to 4 inches deep (determined by customer preference and curbing choice) and approximately 9 inches wide. This trench is where the curbing will be placed. The yard, landscape, drive, sidewalk, or anything else on either side of the trench will not be disturbed.
The main part of the process involves mixing the concrete in the color of your choice and forming the curb using a specially designed machine and the chosen mold style.
Once the curb is formed, we Install control joints and finish the surface of the curb.
Before the concrete is dry, we apply any selected textures, patterns, and release colors.
After the area around the curb is cleared of excess concrete, we coat the entire surface of the curb with a UV Curing Sealer, if selected by the customer.
|
|
|
|
|
|
|